Use this practical checklist to agree what will be checked, on which model and lot, by whom and against which written criteria. Inspection scope and results must be confirmed for each order.
For the selected model and order, ask what is checked at each stage: incoming components, in-process assembly, final functional checks and packing. For every check, confirm the coverage or number of units, when it happens, who records it, which model/configuration and lot it applies to, and how nonconforming units are identified and handled. Record the agreed checkpoints in the inspection plan for your order.
Use an approved reference sample and written order details. Keep checks non-destructive and limited to the actual functions agreed for the selected configuration.
This checklist does not establish health-measurement accuracy, water resistance, temperature endurance or other performance specifications. Use the selected model's approved specification and agreed test method where such checks are required.
Before production or inspection booking, write down the actual completion and packing stage, inspection scope, who inspects, how samples are selected, which approved sample/specification is the reference, defect severity definitions, and the acceptance/rejection decision and handling. Confirm separately whether a factory check or a buyer/third-party inspection is intended, including access, report, fees and timing. Availability and terms need confirmation before booking.
AQL, or acceptance quality limit, is an index used to select an acceptance-sampling plan. Agree the lot, sample selection, checks and acceptance/rejection thresholds for the order. AQL is not a maximum guaranteed actual lot defect rate, a warranty allowance or a promise that every defect will be found. Read the ASQ explanation of acceptance sampling and see our sampling guide.
Check that any report identifies the actual SKU, lot and inspection scope. A generic certificate or unrelated product photo does not document the inspected order. Confirm whether a report will be created and who will provide it; do not assume one exists automatically.
Pre-shipment acceptance is separate from damage found on arrival or faults during use. Agree reporting windows, evidence, remedies, reinspection or return steps, and transport/customs cost responsibility in writing. See the warranty and after-sales guide for terms to confirm.
We are a Guangzhou-based company with our own production factory in Dongguan. Tell us whether you are considering ZTFit-branded watches or customer-brand OEM, the model, quantity, destination, required checks and documentation. We can confirm the applicable scope for your quote. Learn about white-label existing-model options or OEM project scope; you can also browse the catalog.
Agree the finished-goods stage, inspection scope, inspector, sample selection, approved reference and specifications, defect severity definitions, and acceptance or rejection rules before shipment. The checks should match the selected model and order.
Compare the approved model, configuration and software with the order. Visually check the case, screen, buttons, assembly, strap and charger connections; then check supported pairing, reconnection, notifications and interface language against agreed criteria. Test battery runtime under a defined usage profile, and verify accessories, labels, pack quantity and branding.
An acceptance quality limit is an index used to select an acceptance-sampling plan. Agree the lot, sample method, inspection criteria and accept/reject thresholds. AQL does not guarantee the actual defect rate, set a warranty allowance or mean every defect will be found.
Record the order and batch, model and configuration, sample quantity and selection method, criteria and result for each item, defect descriptions and counts, relevant photos, deviations, the decision, and the responsible person and follow-up. A report should identify the actual SKU, lot and inspection scope.
Confirm who will inspect, what the inspection covers, access and reporting arrangements, fees and timing before booking. A factory check and an independent buyer or third-party inspection are different scopes; neither should be assumed to include the other.
Pre-shipment acceptance and later arrival or in-use claims are separate. Confirm reporting windows, evidence, remedies, reinspection, returns and transport or customs costs in the written agreement. See the warranty and after-sales guide.
Share the model, quantity, destination, required checks and documentation. We can confirm the applicable quote scope for ZTFit products or customer-brand OEM.